1.On March 1, Mocl Co. began construction of a smallbuilding. The following expenditures were incurred forconstruction: 1/3 $75000 1/4 74000 1/5 180000 1/6 270000 1/7
1.On March 1, Mocl Co. began construction of a smallbuilding. The following expenditures were incurred forconstruction: 1/3 $75000 1/4 74000 1/5 180000 1/6 270000 1/7 100000The building was complet 1 answer