1-Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Y? (Round your intermediate calculations to 2 decimal places and
1-Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Y? (Round your intermediate calculations to 2 decimal places and final answer to the nearest dollar amount.)
2-Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Z? (Round your intermediate calculations to 2 decimal places and final answer to the nearest dollar amount.)
3-Using the plantwide overhead rate, what percentage of the total overhead cost is allocated to Product Y and Product Z? (Round your answers to 2 decimal places.)
4-Using the ABC system, what percentage of the Machining costs is assigned to Product Y and Product Z? (Round your answers to 2 decimal places.)
5-Using the ABC system, what percentage of Machine Setups cost is assigned to Product Y and Product Z? (Round your answers to 2 decimal places.)
6-Using the ABC system, what percentage of the Product Design cost is assigned to Product Y and Product Z? (Round your answers to 2 decimal places.)
7-Using the ABC system, what percentage of the General Factory cost is assigned to Product Y and Product Z? (Round your answers to 2 decimal places.)
could you please solve these Q separately with steps and explanation for each stepQ
Greenwood Company manufactures two products-15,000 units of Product Y and 7,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Activity Cost Pool Activity Measure Machine-hours Number of setups Number of products Direct labor-hours Estimated Overhead Cost Machining Machine setups Production design General factory S 224,400 S 129,600 S 88,000 S 254,000 Expected Activity 11,000 MHs 240 setups 2 products 10,000 DLHs Product Y 7,400 60 Product Z 3,600 180 Activity Measure Machining Number of setups Number of products Direct labor-hours 8,400 1,600Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance