Question
1 Approved Answer
1.Which of the following values is used in the calculations for both the controllable overhead variance and the overhead volume variance? Overhead applied to production
1.Which of the following values is used in the calculations for both the controllable overhead variance and the overhead volume variance?
Overhead applied to production using the predetermined overhead rate
Flexible budget level of overhead for the actual level of production
Actual overhead incurred
None of these answer choices are used in both calculations.