2 0 onts Scipped Moody Corporation uses a job-order costing system with a plantwide predetermined overhead rate based on machine-hours. At the beginning of the year, the company made the following estimates: Machine-hours required to support estimated production 156,000 Fixed manufacturing overhead cost $ 650,000 Variable manufacturing overhead cost per machine-hour $ 4.40 Required: 1. Compute the plantwide predetermined overhead rate. 2. During the year, Job 400 was started and completed. The following information was available with respect to this job: Direct materials $ 380 Direct labor cost $ 270 Machine-hours used 39 Compute the total manufacturing cost assigned to Job 400 3. If Job 400 includes 50 units, what is the unit product cost for this job? 4. If Moody uses a markup percentage of 120% of its total manufacturing cost, then what selling price per unit would it have established for Job 400? ebook Complete this question by entering your answers in the tabs below. Required 1 Required 2 Required Required* Compute the total manufacturing cost assigned to Job 400. (Round your intermediate calculations to 2 decimal places and your final answer to the nearest dollar amount.) Total manutacturing cost 2 Moody Corporation uses a job-order costing system with a plantwide predetermined overhead rate based on machine-hours. At the beginning of the year, the company made the following estimates: Machine-hours required to support estimated production 156,000 Fixed manufacturing overhead cost $ 650,00 Variable manufacturing overhead cost per machine-hour $ 4.40 Required: 1. Compute the plantwide predetermined overhead rate. 2. During the year, Job 400 was started and completed. The following information was available with respect to this job: Direct materials 5 380 Direct labor cost $ 270 Machine-hour's used 39 shipped Compute the total manufacturing cost assigned to Job 400 3. If Job 400 includes 50 units, what is the unit product cost for this job? 4. Moody uses a markup percentage of 120% of its total manufacturing cost, then what selling price per unit would it have established for Job 4007 Complete this question by entering your answers in the tabs below, Required 1 Required Required Required Job 400 includes so units, what is the unit product cost for this job? (Round your intermediate calculations and inal answer to the nearest whole dolar) Uroda