2. BOL Question a. BOM for WIDGET WIDGET Component A Component B 1 3 2 Using the BOM for the WIDGET above calculate using BOL.

image text in transcribedimage text in transcribedimage text in transcribed

2. BOL Question a. BOM for WIDGET WIDGET Component A Component B 1 3 2 Using the BOM for the WIDGET above calculate using BOL. Line information: Widget run: Shifts 1, duration is 8 hours, productivity is.95 and direct labour hours are 105 b. Routing Table: Material Oper Work ation Center Sequ ence 500 Run time Per unit .150 Total Time Lead per unit. time Setup Time Per unit 2.0 Avg Lot size Avg Setup time per unit Widget 10 100 1 10 100 .150 3.0 100 1 Component A 20 200 .150 1.0 100 1 10 300 .250 1.0 100 1 Component B 20 400 .250 1.0 100 1 Matrix for Calculating Unit time and BOR calculation Widget A B B WC 100 200 300 400 500 Total C. What are the "standard lab hours" (BOL? Calculate RCCP Master Production Schedule (MPS) for Widgets Week 1 Week 2 Week 3 200 100 200 Week 4 100 Week 5 100 RCCP Standard Labour Hours Demonstrated Capacity to achieve MPS for Widgets Week 1 Week 2 Week 3 Week 4 Week 5 3. What is the calculation for Rated Capacity? 4. What is the average weekly load? 5. What is the maximum weekly load? 2. BOL Question a. BOM for WIDGET WIDGET Component A Component B 1 3 2 Using the BOM for the WIDGET above calculate using BOL. Line information: Widget run: Shifts 1, duration is 8 hours, productivity is.95 and direct labour hours are 105 b. Routing Table: Material Oper Work ation Center Sequ ence 500 Run time Per unit .150 Total Time Lead per unit. time Setup Time Per unit 2.0 Avg Lot size Avg Setup time per unit Widget 10 100 1 10 100 .150 3.0 100 1 Component A 20 200 .150 1.0 100 1 10 300 .250 1.0 100 1 Component B 20 400 .250 1.0 100 1 Matrix for Calculating Unit time and BOR calculation Widget A B B WC 100 200 300 400 500 Total C. What are the "standard lab hours" (BOL? Calculate RCCP Master Production Schedule (MPS) for Widgets Week 1 Week 2 Week 3 200 100 200 Week 4 100 Week 5 100 RCCP Standard Labour Hours Demonstrated Capacity to achieve MPS for Widgets Week 1 Week 2 Week 3 Week 4 Week 5 3. What is the calculation for Rated Capacity? 4. What is the average weekly load? 5. What is the maximum weekly load

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Introduction To Management Accounting

Authors: Charles T. Horngren, Gary L. Sundem, William O. Stratton, Dave Burgstahler, Jeff O. Schatzberg

16th Global Edition

0273790013, 978-0273790013

More Books

Students also viewed these Accounting questions

Question

discuss the importance of ethical practice for the HR profession;

Answered: 1 week ago

Question

reference your work in a credible way.

Answered: 1 week ago

Question

read in a critically evaluative way;

Answered: 1 week ago