Question
2. Calculate the takt time for a systemwhere the total time per shift is 480 minutes, there is one shift,and workers are given two 12-minute
2. Calculate the takt time for a systemwhere the total time per shift is 480 minutes, there is one shift,and workers are given two 12-minute breaks and 50 minutes forlunch. Daily demand is 320 units. (Round the finalanswer to 2 decimal places.)
Takt time ------------------ minutes per unit
3. What takt time would match capacityand demand if demand is 150 units a day, there are two shifts of470 minutes each, and workers are given three half-hour breaksduring each shift, one of which is for lunch ordinner? (Round the final answer to 2 decimalplaces.)Takt time ------------------ minutes perunit
4. Which is not a benefit of small lot sizes?
Multiple Choice
Reduced inventory
Increased production flexibility
Problems are more apparent
More frequent setups
5. A lean process design would have which of the followingcharacteristics?
Multiple Choice
Ridged production schedule
Long setups
Flexible system
High inventory
6. Lean was developed in manufacturing and has littleapplication in services.
Multiple Choice
True
False
7. The crucial aspect of the design of products for JIT /leans systems is:
Multiple Choice
Product quality
Production costs
Ease of assembly
Variety of features
8. The technique used to capture the ``voice`` of customersin the way a product is designed is referred to as:
Multiple Choice
Design for easy manufacturing (DFM)
Concurrent engineering
Quality function deployment (QFD)
Continuous improvement
9.One method of setup time reduction is to separate _______setup activities from ________ setup activities.
Multiple Choice
internal, external
standard, specialized
cellular, linear
long, short
10. In the level mixed-model sequence, the due times aresequenced from the ______ to the _______.
Multiple Choice
largest, smallest
earliest, latest
smallest, largest
latest, earliest
11. The following due times have been determined. ItemA=.025, Item B=.017, Item C=.033. What is the level mixed modelsequence for the items?
Multiple Choice
A,B,C
C,A,B
B,C,A
B,A,C
Determine a level mixed-model sequence, given the following demand data: Daily Quantity 1 Product A B D 423 O B-D-C-B-A-D-B-C-D-B O B-C-D-B-A-C-B-D-C-B O B-D-C-C-A-D-B-C-D-D O B-D-D-B-C-A-D-B-C-D-D
Step by Step Solution
3.40 Rating (156 Votes )
There are 3 Steps involved in it
Step: 1
The detailed answer for the above question is provided below 1 The correct level mixedmodel sequence is OBDCBADBCDB 2 The takt time for the system is ...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started