Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

2. Calculate the takt time for a systemwhere the total time per shift is 480 minutes, there is one shift,and workers are given two 12-minute

image

2. Calculate the takt time for a systemwhere the total time per shift is 480 minutes, there is one shift,and workers are given two 12-minute breaks and 50 minutes forlunch. Daily demand is 320 units. (Round the finalanswer to 2 decimal places.)

Takt time ------------------ minutes per unit

3. What takt time would match capacityand demand if demand is 150 units a day, there are two shifts of470 minutes each, and workers are given three half-hour breaksduring each shift, one of which is for lunch ordinner? (Round the final answer to 2 decimalplaces.)Takt time ------------------ minutes perunit

4. Which is not a benefit of small lot sizes?

Multiple Choice

  • Reduced inventory

  • Increased production flexibility

  • Problems are more apparent

  • More frequent setups

5. A lean process design would have which of the followingcharacteristics?

Multiple Choice

  • Ridged production schedule

  • Long setups

  • Flexible system

  • High inventory

6. Lean was developed in manufacturing and has littleapplication in services.

Multiple Choice

  • True

  • False

7. The crucial aspect of the design of products for JIT /leans systems is:

Multiple Choice

  • Product quality

  • Production costs

  • Ease of assembly

  • Variety of features

8. The technique used to capture the ``voice`` of customersin the way a product is designed is referred to as:

Multiple Choice

  • Design for easy manufacturing (DFM)

  • Concurrent engineering

  • Quality function deployment (QFD)

  • Continuous improvement

9.One method of setup time reduction is to separate _______setup activities from ________ setup activities.

Multiple Choice

  • internal, external

  • standard, specialized

  • cellular, linear

  • long, short

10. In the level mixed-model sequence, the due times aresequenced from the ______ to the _______.

Multiple Choice

  • largest, smallest

  • earliest, latest

  • smallest, largest

  • latest, earliest

11. The following due times have been determined. ItemA=.025, Item B=.017, Item C=.033. What is the level mixed modelsequence for the items?

Multiple Choice

  • A,B,C

  • C,A,B

  • B,C,A

  • B,A,C

Determine a level mixed-model sequence, given the following demand data: Daily Quantity 1 Product A B D 423 O B-D-C-B-A-D-B-C-D-B O B-C-D-B-A-C-B-D-C-B O B-D-C-C-A-D-B-C-D-D O B-D-D-B-C-A-D-B-C-D-D

Step by Step Solution

3.40 Rating (156 Votes )

There are 3 Steps involved in it

Step: 1

The detailed answer for the above question is provided below 1 The correct level mixedmodel sequence is OBDCBADBCDB 2 The takt time for the system is ... blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Operations Management

Authors: William J Stevenson

12th edition

2900078024107, 78024102, 978-0078024108

More Books

Students also viewed these Accounting questions