2. During a project phase, Change order (change request) means A) Change in scope B) Change in cost C) Change in Time D) Change in
2. During a project phase, Change order (change request) means A) Change in scope B) Change in cost C) Change in Time D) Change in any work A) Rate of inflow and out flow are not same B) mass in the fluid with respect to time is varying C) Energy possessed in the control volume changed D) All of the above