2. Fill in the time line for the Sawing Department. Use the time line to help you compute the number of equivalent units and the cost per equivalent unit in the Sawing Department for September Show that the sum of (a) cost of goods transferred out of the Sawing Department and (b) ending Work in Process Inventory-Sawing equals the total cost accumulated in the department during September Journalize all transactions affecting the company's sawing process during September, including those already posted. Print Done The Grand Northern Furniture Company produces dining tables in a three-stage processing, sembly, and staining Costs incurred in the Swing Department during September are summarized as follows: m Click the loon to view the costs) Direct materials (umber) are added at the beginning of the sewing process, while conversion costs we nourred every throughout the process. September activity in the Sewing Department included sewing of 13,000 metres of lumber, which were transferred to the Assembly Department. Also, work began on 2.000 metres of lumber, which on September 30 were 75% of the way through the sewing process Requirements Requirement 1. in the timeline for the Swing Department Start Complete The Grand Northerm Furniture Company produces dining tables in a three stage processing, assembly, and staining Costs incurred in the Sawing Department during September are summarized as follows: Click the loon to view the costs) Siret materials Lumber) are added at the beginning of the sewing process, while son costs are nourred evenly throughout the September activity in the Sawing Department included sawing of 13,000 metres of lumber which were transferred to the Departments work began on 2000 metres of lumber, which on September 30 were 75of the way through the swing process Requirements Work in Process Inventory-Sawing September 1 balance Direct materials 1,860,000 Direct labour 143,000 Manufacturing overhead 161,500