Answered step by step
Verified Expert Solution
Question
1 Approved Answer
2. How much manufacturing overhead was applied to Job P and how much was applied to Job Q ? Note: Do not round intermediate calculations.
2. How much manufacturing overhead was applied to Job P and how much was applied to Job Q ? Note: Do not round intermediate calculations. 8. What is Sweeten Company's cost of goods sold for the year? Note: Do not round intermediate calculations. 6. If Job Q includes 30 units, what is its unit product cost? Note: Do not round intermediate calculations. Round your final answer to nearest whole dollar. Required information The Foundational 15 (Algo) [LO2-1, LO2-2, LO2-3, LO2-4] [The following information applies to the questions displayed below.] Sweeten Company had no jobs in progress at the beginning of the year and no beginning inventories. It started, completed, and sold only two jobs during the year-Job P and Job Q. The company uses a plantwide predetermined overhead rate based on machine-hours. At the beginning of the year, it estimated that 4,000 machine-hours would be required for the period's estimated level of production. Sweeten also estimated $27,400 of fixed manufacturing overhead cost for the coming period and variable manufacturing overhead of $2.30 per machine-hour. Because Sweeten has two manufacturing departments-Molding and Fabrication-it is considering replacing its plantwide overhead rate with departmental rates that would also be based on machine-hours. The company gathered the following additional information to enable calculating departmental overhead rates: The direct materials cost, direct labor cost, and machine-hours used for Jobs P and Q are as follows: Sweeten Company had no overapplied or underapplied manufacturing overhead costs during the year. Required: For questions 1-8, assume that Sweeten Company uses a plantwide predetermined overhead rate with machine-hours as the allocation base. For questions, 9-15, assume that the company uses predetermined departmental overhead rates with machine-hours as the allocation base in both departments. 5. What is the total manufacturing cost assigned to Job Q? Note: Do not round intermediate calculations. 1. What is the company's plantwide predetermined overhead rate? Note: Round your answer to 2 decimal places. 4. If Job P includes 20 units, what is its unit product cost? Note: Do not round intermediate calculations. Round your final answer to nearest whole dollar. 7. Assume that Sweeten Company uses cost-plus pricing (and a markup percentage of 80% of total manufacturing cost) to establish selling prices for all of its jobs. If Job P includes 20 units and Job Q includes 30 units, what selling price would the company establish for Jobs P and Q ? What are the selling prices for both jobs when stated on a per unit basis? Note: Do not round intermediate calculations. Round your final answers to nearest whole dollar. 3. What is the total manufacturing cost assigned to Job P? Note: Do not round intermediate calculations. Round your final answer to nearest whole dollar
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started