Question
2. The standard cost of product 5252 includes1.90hours of direct labor at $11.50per hour. The predetermined overhead rate is $22.00per direct labor hour. During July,
2. The standard cost of product 5252 includes1.90hours of direct labor at $11.50per hour. The predetermined overhead rate is $22.00per direct labor hour. During July, the company incurred4,000hours of direct labor at an average rate of $11.70per hour and $82,300of manufacturing overhead costs. It produced2,000units.
(a) Compute the total, price, and quantity variances for labor.
Total labor variance $_______________ ________________(Favorable, Neither favorable nor unfavorable, Unfavorable)
Labor price variance $_______________ ________________(Favorable, Neither favorable nor unfavorable, Unfavorable) Labor quantity variance$ $_______________ ________________(Favorable, Neither favorable nor unfavorable, Unfavorable)
(b) Compute the total overhead variance (show computation)
Total overhead variance $ ____________________
3. Monty, Inc. is trying to establish the standard labor cost of a typical oil change. The following data have been collected from time and motion studies conducted over the past month.
Actual time spent on the oil change 1hour
Hourly wage rate $14
Payroll taxes 10% of wage rate
Setup and downtime 17% of actual labor time
Cleanup and rest periods 23% of actual labor time
Fringe benefits 25% of wage rate
(Required and show your solution on the following:
a.Determine the standard direct labor hours per oil change.(Round answer to 2 decimal places, e.g. 2.75.)
Standard direct labor hours per oil change _________ hours
b.Determine the standard direct labor hourly rate.(Round answer to 2 decimal places, e.g. 2.75.)
Standard direct labor hourly rate $___________
c.Determine the standard direct labor cost per oil change. (Round answer to 2 decimal places, e.g. 2.75.)
Standard direct labor cost per oil change $___________
d.If an oil change took 1.5 hours at the standard hourly rate, what was the direct labor quantity variance? (Round answer to 2 decimal places, e.g. 2.75.)
Direct labor quantity variance $ ______________
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started