Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

. 2. The total construction cost of a Ford car factory with a production capacity of 4000 cars/day in Detroit, MI, completed in year 2010

image text in transcribed
. 2. The total construction cost of a Ford car factory with a production capacity of 4000 cars/day in Detroit, MI, completed in year 2010 was $900 million. A proposed similar factory with a production capacity of 3500 cars/day is to be built in Tallahassee, FL, for completion in 2020. Moreover, the following data was obtained. Develop a parametric estimate for the total cost of the Tallahassee factory. For the Detroit factory, there was a work item of $8 million for site preparation, which is not typical for other similar factories. Special hurricane resistance work items will be done for the Tallahassee factory and they cost $12.5 million. The cost capacity factor for these type of buildings x = 0.6 The inflation rate for the period from 2010 to 2020 is 2.5% per year. The location construction index was 1.4 for Detroit and 1.2 for Tallahassee in 2020. New air pollution equipment for the Tallahassee factory will cost $12.2 million in 2020 (that equipment was not required for Detroit). An increased contingency cost of 3% of total construction cost is expected for the Tallahassee factory due to expected rain delays. The new factory in Tallahassee will seek LEAD certification as a green building. The total predicted cost for the certification is 8% of the total cost. No green certification was required for the Detroit factory. . . . . 2. The total construction cost of a Ford car factory with a production capacity of 4000 cars/day in Detroit, MI, completed in year 2010 was $900 million. A proposed similar factory with a production capacity of 3500 cars/day is to be built in Tallahassee, FL, for completion in 2020. Moreover, the following data was obtained. Develop a parametric estimate for the total cost of the Tallahassee factory. For the Detroit factory, there was a work item of $8 million for site preparation, which is not typical for other similar factories. Special hurricane resistance work items will be done for the Tallahassee factory and they cost $12.5 million. The cost capacity factor for these type of buildings x = 0.6 The inflation rate for the period from 2010 to 2020 is 2.5% per year. The location construction index was 1.4 for Detroit and 1.2 for Tallahassee in 2020. New air pollution equipment for the Tallahassee factory will cost $12.2 million in 2020 (that equipment was not required for Detroit). An increased contingency cost of 3% of total construction cost is expected for the Tallahassee factory due to expected rain delays. The new factory in Tallahassee will seek LEAD certification as a green building. The total predicted cost for the certification is 8% of the total cost. No green certification was required for the Detroit factory

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Accounting questions