Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

The city of Conroe is planning the installation of a new water treatment plant to supply a growing population. There will be only one

          

The city of Conroe is planning the installation of a new water treatment plant to supply a growing population. There will be only one rapid mixing basin and then the flow will be evenly split between two flocculator trains, each with three basins equal in volume. The required water depth of all basin is 4.0 m. Determine: a) basin volumes, (5 points) b) basin dimentions, (6 points) c) tank equivalent diameter, (6 points) d) required imput power, (6 points) e) impeller diameter from table below, (6 points) and f) rotational speed using the following parameters, (6 points) Q=11.5*10 m/d Rapid mix t = 2 min Based on pilot studies, the rapid mix t = 2 min. to remove color and natural organic matter Rapid mix G= 600 s Total flocculation t = 30 min. Flocculators G = 70, 50,30 s Water Temperature=5 C Place impeller at one-third the water depth It's common practice to make the length and width of mixing basins equal. Impeller type Radial Axial Impeller diameters (m) 0.8 1.1 1.4 0.8 1.4 2.0 Power number (N.) 5.7 0.31

Step by Step Solution

3.39 Rating (155 Votes )

There are 3 Steps involved in it

Step: 1

Solution a Basin Volumes Total required basin volume Rapid mixing basin volume Flocculator train vol... blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Smith and Roberson Business Law

Authors: Richard A. Mann, Barry S. Roberts

15th Edition

1285141903, 1285141903, 9781285141909, 978-0538473637

More Books

Students also viewed these Civil Engineering questions