Question
2. Using the plantwide overhead rate, how much manufacturing overhead cost is allocated to Product Y and Product Z? (Round your intermediate calculations to 2
2. Using the plantwide overhead rate, how much manufacturing overhead cost is allocated to Product Y and Product Z? (Round your intermediate calculations to 2 decimal places. Round your answers to the nearest dollar amount.)
3. What is the activity rate for the Machining activity cost pool? (Round your answer to 2 decimal places.)
4. What is the activity rate for the Machine Setups activity cost pool?
5. What is the activity rate for the Product Design activity cost pool?
6. What is the activity rate for the General Factory activity cost pool? (Round your answer to 2 decimal places.)
9. Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Y? (Round your intermediate calculations to 2 decimal places. Round your answers to the nearest dollar amount.)
10. Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Z? (Round your intermediate calculations to 2 decimal places. Round your answers to the nearest dollar amount.)
Required information Foundational (LO4-1, LO4-2, LO4-3, LO4-4) Greenwood Company manufactures two products15,000 units of Product Y and 7,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Activity Cost Pool Machining Machine setups Production design General factory Activity Measure Machine-hours Number of setups Number of products Direct labor-hours Estimated Overhead Cost $ 213,400 $ 61,600 $ 78,000 $ 244,000 Expected Activity 11,000 MHs 140 setups 2 products 10,000 DLHs Activity Measure Machining Number of setups Number of products Direct labor-hours Product Y 7,400 60 1 7,400 Product 2 3,600 80 1 2,600 Foundational 4-1 Required: 1. What is the company's plantwide overhead rate? (Round your answer to 2 decimal places.) Predetermined overhead rate per DLH
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access with AI-Powered Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started