Answered step by step
Verified Expert Solution
Question
1 Approved Answer
2. Using the result of PreLab Question 1 along with the spring constant from the slope of the graph, calculate the total work done by
2. Using the result of PreLab Question 1 along with the spring constant from the slope of the graph, calculate the total work done by the spring. Note that the displacement was 0.25 m. Show your work. Drelab question: W = gkxlz 3. The work done by the spring can be broken down by the work done by each 5 cm stretch. Using your Force (N) data from table 1, calculate the average force applied by the spring over each 5 cm stretch. (For example, ((15t row cell) + {2"d row ce||))f2 = 15t cell under the ForceAverage (N) column, and so on.) 4. Calculate the work done in each segment using the average forces from Post-Lab Question 3 and determine the total work done by adding all gf the segments together. How does this compare, using a % difference, to the work done by the spring calculated in Post-Lab Question 2? Table 1. Spring Scale Force Data Force (N) A Distance, Ax Distance, x (m) ForceAverage (N) Work (J) (m) 0 0 0.06 N 0.05 0.003 J 0.12 0.05 0.24 N 0.05 0.012 J 0.35 0.10 0.39 N 0.05 0.020 J 0.42 0.15 0.45 N 0.05 0.023 J 0.48 0.20 0.49 N 0.05 0.025 J 0.50 0.25
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started