Answered step by step
Verified Expert Solution
Question
1 Approved Answer
The following information on the upper floor slabs are obtained from the cost analysis of a past project: 4 storey building 200mm concrete upper
The following information on the upper floor slabs are obtained from the cost analysis of a past project: 4 storey building 200mm concrete upper floor slabs GFA is 3200m2 (4 floors, each of 800m2) Element Rate is $158/m2 Cost Index is 300 The following information are for the upper floors of a proposed building: 5 storey building 250mm concrete upper floor slabs GFA = 3000 m2 (5 floors, each of 600m2) Current Cost Index is 320 (a) Appraise the previous project information and determine the: (i) Elemental cost of the upper floors for the proposed building. (5 marks) (ii) Elemental unit rate of the upper floors for the proposed building. (5 marks) (iii) Element rate of the upper floors for the proposed building. (5 marks) (b) Explain the differences between Elemental Cost; Element Unit Rate and Element Rate.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
a Appraisal of the previous project information i Elemental cost of the upper floors for the propose...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started