Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

2.0 Figure (2) shows the floor plan of an office building with Live load intensity of 4 KN/m. No projected beams were allowed except on

image text in transcribed

2.0 Figure (2) shows the floor plan of an office building with Live load intensity of 4 KN/m. No projected beams were allowed except on axes D, G, 1 & 4 as shown. Using Hollow block slab system, it is required to: a. Compute slab thickness, block size and arrangement of a one-way hollow block slab system enclosed between axes 1-4 and A-D. Draw the statical system of ribs along a vertical strip between axes 1-2 showing the appropraite arrangement of the steel re-bars (without calculations). Illustrate the concrete dimensions of the slab along a vertical section between axes 1-2 and horizontal section between axes B-C. b. Illustrate the block size and arrangement if a two-way hollow block slab system wwas used between axes 1-4 and A-D. Draw the statical system of ribs along a vertical strip between axes 23 showing the appropraite arrangement of the steel re-bars (without calculations). 2 (4) 0 7.0m 50 m 3.0 m 3.0 3.5 4.50 4.30 6 4.60 5.10 Figure 2: Floor plan of an office building 2.0 Figure (2) shows the floor plan of an office building with Live load intensity of 4 KN/m. No projected beams were allowed except on axes D, G, 1 & 4 as shown. Using Hollow block slab system, it is required to: a. Compute slab thickness, block size and arrangement of a one-way hollow block slab system enclosed between axes 1-4 and A-D. Draw the statical system of ribs along a vertical strip between axes 1-2 showing the appropraite arrangement of the steel re-bars (without calculations). Illustrate the concrete dimensions of the slab along a vertical section between axes 1-2 and horizontal section between axes B-C. b. Illustrate the block size and arrangement if a two-way hollow block slab system wwas used between axes 1-4 and A-D. Draw the statical system of ribs along a vertical strip between axes 23 showing the appropraite arrangement of the steel re-bars (without calculations). 2 (4) 0 7.0m 50 m 3.0 m 3.0 3.5 4.50 4.30 6 4.60 5.10 Figure 2: Floor plan of an office building

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Corporate Environmental Responsibility Accounting And Corporate Finance In The EU

Authors: Panagiotis Dimitropoulos, Konstantinos Koronios

1st Edition

3030727726, 9783030727727

More Books

Students also viewed these Accounting questions