Question
2004 Production Budget production 10,000 bicycles Actual production 10,800 Bicycles Frame assembly: Steel tubing =3,300,000(110,000 lbs@ $30/) Paint = 25,000 (1250 gals@ $20/gal) labor =1,500,000
2004 Production
Budget production 10,000 bicycles | Actual production 10,800 Bicycles | |
Frame assembly: Steel tubing =3,300,000(110,000 lbs@ $30/) Paint = 25,000 (1250 gals@ $20/gal) labor =1,500,000 (100,000 @ $15/hr) Total = 4,825,000 | Frame assembly: steel tubing=3,572,100(113,400 lbs@ $31.50/lb.) Paint = 28,187 (1,375 gals@ $ 20.50/gal) labor =1,528,050 (100,200 hrs @ $15.25/hr ) Total frame = 5,128,337 | |
Wheel assembly: Parts = 1,200,000 (10,000 kits @$120/kit) Labor = 65,000 (5,000 hrs @ $13/hr ) Total = 1,265,000 | Wheel assembly: Parts = $ 1,317,600 (10,800 kits @$122.00/kit) Rework Parts= 25,000 (spokes and rims) Labor = 74,250 (5,500 hrs @ $13.50/hr ) Total = 1,416,850 | |
Final assembly: Parts =1,200,000 (10,000 @ $ 350/kits) Labor= 105,000 (7,500 hrs @ $14/hr) Total = 3,605,000 | Final assembly: Parts =3,963,600 (10,800 @ $ 367/kits) Rework Parts = 45,000 (miscellaneous parts) Labor= 116,000 (8,000 hrs @ $14.50/hr) Total =4,124,600 | |
Overhead Cost: Rent =250,000 Office Staff =100,000 Depreciation =100,000 Other costs =750,000 (estimated to be 2/3 variable) Total Overhead =1,200,000 Total Annual Costs = 10,895,000
|
Question #1 Prepare the Static Budget, Actual Budget and Flexible Budget for Mile High Cycles.
There are no sales prices, so just the costs are to be analyzed.
- Assume that the ratio of fixed to variable overhead costs actually stayed the same as expected. So 1/3 fixed and 2/3 variable.
- Assume that overhead is allocated on a per unit basis.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started