Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

21. In spite of the pollution exclusion, contractors still have some important coverage for pollution exposures under the CGL. These exceptions retain coverage for all

image text in transcribed
21. In spite of the pollution exclusion, contractors still have some important coverage for pollution exposures under the CGL. These exceptions retain coverage for all of the following except (Search Chapter 3). O a. accidental discharge of fuels, lubricants, or other operating fluids the contractor brings to the site that are essential to the operation of "mobile equipment." Ob. heat, smoke, or fumes from a "hostile fire." O c. "bodily injury" sustained in a building owned or operated by the insured that is caused by smoke, fumes, vapor, or soot from equipment used to heat the building. O d. "bodily injury" sustained in a building owned or operated by the insured that is caused by pollutants used in the course of the insured's business. 22. The Coverage A personal and advertising injury exclusion removes coverage for what type(s) of damages arising out of "personal and advertising injury"? (Search Chapter 3) O a. all property damage only O b. all bodily injury O c. all bodily injury and property damage O d. bodily injury, but only with respect to employees of the named insured 23. Which of the following accidents would be excluded by the CGL pollution exclusion? (Search Chapter 3) O a. While digging a trench at a construction site, a contractor accidentally ruptures an underground pipe, and chemicals leak into the ground, contaminating the soil. O b. A contractor brings a fuel tank to a job site to refuel its equipment. While on the site, the fuel tank ruptures, spilling gasoline that contaminates the soil. O c. A worker loses control of his forklift and collides with a cement truck, which is also owned by the contractor. The truck's gas tank is ruptured and fuel spills out onto the ground, contaminating the soil. O d. Six months after work is completed, an underground pipe installed by the contractor at a manufacturing plant begins to leak hazardous solvents into the ground, contaminating the soil

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Introduction to Management Science

Authors: Bernard W. Taylor

11th Edition

132751917, 978-0132751919

More Books

Students also viewed these General Management questions