2.21 The Public Service Board (PSB) awarded two contracts worth a combined $3.07 million to increase the depth of a retention basin and reconstruct a
2.21 The Public Service Board (PSB) awarded two contracts worth a combined $3.07 million to increase the depth of a retention basin and reconstruct a spillway that was severely damaged in a flood 2 years ago. The PSB president stated that, surprisingly, the bids were $1,150,000 lower than PSB engineers estimated. If the projects are assumed to have a 20-year life, what is the annual worth ofthe savings at an interest rate of 5% per year