Answered step by step
Verified Expert Solution
Question
1 Approved Answer
29.6 A very soti clay deposit, over which a road embankment that is 20 m wide at ground level is to be constructed, can be
29.6 A very soti clay deposit, over which a road embankment that is 20 m wide at ground level is to be constructed, can be stabilized (i) by constructing overlapping columns of clay with 5% cement using deep mixing technique or (ii) by replacing 50% of clay by gravel columns using stone column technique. The clay deposit is 6 m deep. Compare the cost of treatment if gravel is available at Rs. 800 per mand cement is available at Rs. 300 per kN. The cost of constructing cement columns or gravel columns is about the same and only the cost of materials needs to be considered. 29.6 A very soti clay deposit, over which a road embankment that is 20 m wide at ground level is to be constructed, can be stabilized (i) by constructing overlapping columns of clay with 5% cement using deep mixing technique or (ii) by replacing 50% of clay by gravel columns using stone column technique. The clay deposit is 6 m deep. Compare the cost of treatment if gravel is available at Rs. 800 per mand cement is available at Rs. 300 per kN. The cost of constructing cement columns or gravel columns is about the same and only the cost of materials needs to be considered
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started