Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

29.6 A very soti clay deposit, over which a road embankment that is 20 m wide at ground level is to be constructed, can be

image text in transcribed

29.6 A very soti clay deposit, over which a road embankment that is 20 m wide at ground level is to be constructed, can be stabilized (i) by constructing overlapping columns of clay with 5% cement using deep mixing technique or (ii) by replacing 50% of clay by gravel columns using stone column technique. The clay deposit is 6 m deep. Compare the cost of treatment if gravel is available at Rs. 800 per mand cement is available at Rs. 300 per kN. The cost of constructing cement columns or gravel columns is about the same and only the cost of materials needs to be considered. 29.6 A very soti clay deposit, over which a road embankment that is 20 m wide at ground level is to be constructed, can be stabilized (i) by constructing overlapping columns of clay with 5% cement using deep mixing technique or (ii) by replacing 50% of clay by gravel columns using stone column technique. The clay deposit is 6 m deep. Compare the cost of treatment if gravel is available at Rs. 800 per mand cement is available at Rs. 300 per kN. The cost of constructing cement columns or gravel columns is about the same and only the cost of materials needs to be considered

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Accounting questions