Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

3. A formwork system will be used to cast an elevated 8 thick, normal weight concrete slab. The construction live load is medium duty

image text in transcribed

3. A formwork system will be used to cast an elevated 8" thick, normal weight concrete slab. The construction live load is "medium duty" and the formwork is estimated to weigh 5 psf. Formwork sheathing will be 5/8" thick, Class I Plyform installed in the strong direction. a. Is a spacing of 20" for the joists structurally adequate? No need to design the entire slab formwork system. Just determine if the 20" plywood span is structurally sufficient to carry the load (check plywood bending, shear, and deflection at L/360). b. Regardless of whether the 20" spacing is adequate, should 20" spacing ever be used? Explain why or why not. c. What joist spacing would you specify in this design?

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

MIS Essentials

Authors: David M. Kroenke

4th edition

978-0133546590, 133546594, 978-0133807479

More Books

Students also viewed these Accounting questions