Answered step by step
Verified Expert Solution
Question
1 Approved Answer
3. Consider the following given data. Sl num 1 2 3 4 LO 5 6 Data 16.9 3.7 18.9 5.6 14.1 6.1 [6] It
3. Consider the following given data. Sl num 1 2 3 4 LO 5 6 Data 16.9 3.7 18.9 5.6 14.1 6.1 [6] It is required to obtain two groups from the above given data into clusters A and B. Both the groups are represented with the Gaussian distribution. For cluster, A is initialized with a mean of 5.0 and standard deviation of 1.0 while cluster B is initialized with a mean of 10.0 and standard deviation of 1.5. Perform the cluster based on the Expectation-Maximization technique assuming the prior probabilities of each cluster A and B is 0.5. Show the two iterations of the Expectation-Maximization technique and each iteration compute the likelihood, posterior probabilities, mean, and variance for each cluster. [6]
Step by Step Solution
★★★★★
3.54 Rating (157 Votes )
There are 3 Steps involved in it
Step: 1
To perform the ExpectationMaximization EM technique for clustering based on the given data we will follow the steps iteratively until convergence Lets go through two iterations of the EM algorithm Ite...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started