Answered step by step
Verified Expert Solution
Question
1 Approved Answer
3. Penny's Pies is a small specialty supplier to a national coffee -house chain. Penny's makes three types of pies (apple, cherry, and pecan). Penny's
3. Penny's Pies is a small specialty supplier to a national coffee -house chain. Penny's makes three types of pies (apple, cherry, and pecan). Penny's operates 250 days per year with a single eight-hour shift. Capacity is controlled by the number of production lines within the bakery (a line consists of mixing equipment, rolling and cutting equipment, an oven, and packaging equipment). Based on the information provided in the table, determine the number of production lines Penny's should have. Hint: The total operating time required is the sum of total processing time and total setup time. To calculate the total setup time, you need to first calculate the total number of setups required by dividing demand forecast by lot size. Pie DemandForecast Processing Time Lot Size Setup Time (pies/year) (minutes pie) (# of pies) (minutessetup Apple 60,000 600 10 Cherry 30,000 4 200 15 Pecan 20,000 200 30
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started