Answered step by step
Verified Expert Solution
Question
1 Approved Answer
3 Unit Commitment (40 pts) Consider the utility has the following load profile: Hour 12AM - 8AM 8AM - 4PM 4PM - 8PM 8PM -
3 Unit Commitment (40 pts) Consider the utility has the following load profile: Hour 12AM - 8AM 8AM - 4PM 4PM - 8PM 8PM - 12AM Demand [MW] 345MW 525MW 565MW 425MW 1. Assume only Unit 1 is on at the start of the day. Solve the unit commitment. For each period, calculate the dispatch result, on/off status of each generator, and the marginal system cost. Also show the total system operating cost of the day. Hour Status Dispatch (MW) Marginal Cost Unit 1 Unit 2 Unit 3 Unit 1 Unit 2 Unit 3 (S/MWh) 12AM - 8AM 8AM - 4PM 4PM-8PM 8PM - 12AM Total operating cost: Table 2: Example Unit Commitment Schedule Table 2. Assume the utility conducted an upgrade for Unit 2 and its maximum generation capacity is increased from 200MW to 300MW. Calculate how much this utility could save from this upgrade in this operating day. Please list out the full optimization problem and explain your solution strategy. You can use any preferred solution method to solve the problem, including using optimization software. If you are using the piece-wise linear method to solve the economic dispatch, please re-calculate the actual marginal cost and total system cost using the dispatch result and the actual cost function (not the piece-wise linear ones). 3 Unit Commitment (40 pts) Consider the utility has the following load profile: Hour 12AM - 8AM 8AM - 4PM 4PM - 8PM 8PM - 12AM Demand [MW] 345MW 525MW 565MW 425MW 1. Assume only Unit 1 is on at the start of the day. Solve the unit commitment. For each period, calculate the dispatch result, on/off status of each generator, and the marginal system cost. Also show the total system operating cost of the day. Hour Status Dispatch (MW) Marginal Cost Unit 1 Unit 2 Unit 3 Unit 1 Unit 2 Unit 3 (S/MWh) 12AM - 8AM 8AM - 4PM 4PM-8PM 8PM - 12AM Total operating cost: Table 2: Example Unit Commitment Schedule Table 2. Assume the utility conducted an upgrade for Unit 2 and its maximum generation capacity is increased from 200MW to 300MW. Calculate how much this utility could save from this upgrade in this operating day. Please list out the full optimization problem and explain your solution strategy. You can use any preferred solution method to solve the problem, including using optimization software. If you are using the piece-wise linear method to solve the economic dispatch, please re-calculate the actual marginal cost and total system cost using the dispatch result and the actual cost function (not the piece-wise linear ones)
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access with AI-Powered Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started