3.2.1 Determine the total duration of each assembly activity. (2) 3.2.2 Calculate the cycle time. (2) 3.2.3 Calculate the positional weight of each assembly activity.
3.2.1 Determine the total duration of each assembly activity. (2) 3.2.2 Calculate the cycle time. (2) 3.2.3 Calculate the positional weight of each assembly activity. (6) 3.2.4 Assign the activities to the workstations according to their Rank Positional Weights. Show full calculations, including the cumulative station times and the unassigned station times. (8)
3.2 An assembly line whose activities are shown below, is capable of producing 30 units a day (8 hour shift). Activity Duration Immediate (minutes) 5 Amount of times activity is performed for each assembly task 1 predecessorls None B 3 1 None 4 2 None D 3 3 A,B E 6 1 B,C F 1 1 C,E G 4 4 D,E,F H 2 2 F,G Activa [TURN OVER] Go to Settings to activate Windows. 3.2 An assembly line whose activities are shown below, is capable of producing 30 units a day (8 hour shift). Activity Duration Immediate (minutes) 5 Amount of times activity is performed for each assembly task 1 predecessorls None B 3 1 None 4 2 None D 3 3 A,B E 6 1 B,C F 1 1 C,E G 4 4 D,E,F H 2 2 F,G Activa [TURN OVER] Go to Settings to activate WindowsStep by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started