33 Exercises & Problems alock Factory Overhead Cost variances The following data relate to factory overhead cost for the production of 4,000 computer Variable factory overhead 193.100 Fredactory overhead M.000 4.000 530 120,000 protective capoty of 100was 6,000rs and the total factory were combled at the level of 4,000 anderd hours was $132.000, determine the variable factory overhead core variantenfredactory overhead, and total actory overhead covariance. The feed factory overed 16 per hour travel time and an able race as a positive number Variance Amount favorable/Unfavorable To factory overhead strane MyLab Mathea Digital Learning 23-3 Eies & Problems The flowing data relate to tectory overhead cost for the production of 4,000 comes Veran tactory overhead $93.100 Factory overhead 16.000 4,000 390 120,000 productive any of 6.00 hours and the factory overhead cont buted at the 4.000 standard row $132.000, determine the variable factory overheat controle variant, fed factory where, and cry overhede variance. The feed actory overhead rate was 16 per hour. Erter att varande as negative sing and an averant as a poster Varlene Amount Favorable/Unfavorable Verable factory overhead contabile varie Fedorovehead verance Total factory weet van 3 Exercises & Problems eBook Calculator Factory Overhead Cost Variances The following data relate to factory overhead cost for the production of 4,000 computers: Actual: Variable factory overhead $93,100 Fixed factory overhead 36,000 Standard: 4,000 hrs. at $30 120,000 of productive capacity of 100% was 6,000 hours and the total factory overhead cost budgeted at the level of 4,000 standard overhead cost variance. The fixed factory overhead rate was $6 per hour. Enter a favorable variance as a negative number Variance Amount Favorable/Unfavorable Variable factory overhead controllable variance Fixed factory overhead volume variance Total factory overhead cost variance Check My Work 2 more Check My Wones mang Asset Score: 50% MacBou - Sh... Crunchyroll Streaming Help D... Unemployment jobs PMyLab Math | Pea... Digital Learning &... evel of 4,000 standard hours was $132,000, determine the variable factory overhead controllable variance, fixed factory overhead volume variance, and total factory was a negative number using a minus sign and an unfavorable variance as a positive number Previous Next Send Ex Submit Assignment for Grading