4) A small project consists of activities from 'A' to 'I'. The following table indicates the precedence relationship among activities and the three time
4) A small project consists of activities from 'A' to 'I'. The following table indicates the precedence relationship among activities and the three time estimates; optimistic, most likely and pessimistic time for each activity in days. Activity Predecessor Relationship Optimistic time Most likely Pessimistic time Time A - 2 5 8 B A 6 9 12 C A 6 7 8 B, C 1 4 7 E A F D, E G C H I F, G H 85335 8 8 14 17 12 21 6 9 5 8 11 i) Draw the project network. Determine the expected time and variance for each activity (3) ii) Obtain the total expected duration of the project and critical path iii)What is the probability of completing the project in 50 days? (2) (2)
Step by Step Solution
There are 3 Steps involved in it
Step: 1
i To draw the project network we can represent the activities as nodes and connect them based on their precedence relationships The expected time TE and variance V for each activity can be calculated ...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started