Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

4. Change the estimated total amount of the allocation base back to 68,000 machine-hours, so that the data area of you worksheet looks exactly the

image text in transcribedimage text in transcribed

4. Change the estimated total amount of the allocation base back to 68,000 machine-hours, so that the data area of you worksheet looks exactly the same as in Requirement 2. Now change the actual manufacturing overhead cost from $504,400 to $500,500. The data area of your worksheet should now look like this: A B 1 Chapter 3: Applying Excel 2 3 Data Allocation base 4 5 Machine-hours $ 496,400 68,000 machine-hours $ 500,500 75,000 machine-hours Estimated manufacturing overhead cost Estimated total amount of the allocation base Actual manufacturing overhead cost Actual total amount of the allocation base 6 7 8 (a) By how manufacturing erhead underapplied overapplied? manufacturing overhead (b) Why is the amount of underapplied (overapplied) manufacturing overhead different from Requirement 2 above? (You may select more than one answer. Single click the box with the question mark to produce a check mark for a correct answers and double click the box with the question mark to empty the box for a wrong answers. Any boxes left with a question mark will be automatically graded as incorrect.) The predetermined overhead rate changed. The change in the actual manufacturing overhead cost directly resulted in a comparable change in the amount of underapplied (overapplied) manufacturing overhead. The change in the estimated total amount of the allocation base affected the amount of manufacturing overhead applied. 2. Change all of the numbers in the data area of your worksheet so that it looks like this: B A 1 Chapter 3: Applying Excel N 3 4 5 Data Allocation base Estimated manufacturing overhead cost Estimated total amount of the allocation base Actual manufacturing overhead cost Actual total amount of the allocation base Machine-hours $ 496,400 68,000 machine-hours $ 504,400 75,000 machine-hours 6 7 8 If your formulas are correct, you should get the correct answers to the following questions. (a) What is the Predetermined overhead rate? (Round your answer to 2 decimal places.) Answer is complete and correct. Predetermined overhead rate $ 7.30 per machine-hour (b) By how much is the manufacturing overhead underapplied or overapplied? Answer is complete and correct. Overapplied manufacturing overhead $ 43,100

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Pioneers Of Critical Accounting A Celebration Of The Life Of Tony Lowe

Authors: Jim Haslam, Prem Sikka

1st Edition

113754211X, 9781137542113

More Books

Students also viewed these Accounting questions

Question

=+c. Find or create a visual.

Answered: 1 week ago