4 Taveras Corporation is currently operating at 50% of its aveable manufacturing capacity It uses a job order costing item with a plantwide predetermined overhead rate based on machine hours. At the beginning of the year, the company made the following estimates 20 Dot Machine hour required to support estimated production Feed manufacturing overhead cost Variable facturing over the cost per eachinebour 165.00 1 1.900.000 $ 200 Book Required: 1. Compute the plantwide predetermined overhead rate 2. During the year, Job P9o was started, completed and sold to the customer for $2.500 The towing information is available with respect to this job D Him Direct sterials Direct labor coat Machinehours used 5.1.11 53 72 Compute the total manufacturing cost assigned to Job P90 Complete this question by entering your answers in the tabs below Resulted 1 Required 2 Compute the plantwide predetermined overhead ratt Required 2 > Saved z 3 4 Taveras Corporation is currently operating at 50% of its available manufacturing capacity. It uses a job-order costing system with a plantwide predetermined overhead rate based on machine-hours. At the beginning of the year, the company made the following estimates nts Machine-hours required to support estimated production Fixed manufacturing overhead cost Variable manufacturing overhead cost per machine-hour 165,000 $ 1,980,000 $ 2.00 eBook Required: 1 Compute the plantwide predetermined overhead rate. 2. During the year, Job P90 was started, completed, and sold to the customer for $2,500 The following information was available with respect to this job Hint Direct materials Direct labor cost Machine-hours used 5 1,150 $830 72 Print Compute the total manufacturing cost assigned to Job P90. References Complete this question by entering your answers in the tabs below. Required 1 Required 2 Compute the total manufacturing cost assigned to Job P90 Direct materials Direct labor Overhead applied Total manufacturing cost