Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

4. What are the two reasons why the manufacturing wastes need to include in the material quantity in a BOM? Bill of Materials l A

4. What are the two reasons why the manufacturing wastes need to include in the material quantity in a BOM?

image text in transcribed
Bill of Materials l A BOM lists all the items and quantities needed to produce a quality product. I An incorrect quantity or item can result in excessive inventory or the inability to ship a product. All quanties in the ROM must be expressed in the unit of purchase. For example, if the purchasing unit of measure is each. then each item in the bill will be each. If the bill requires a quantity of four, then alquantitg.r of four will be in the bill. If the purchasing unit of measure is a thousandth and the bill states that a quantity of eight is needed, then the quantity in the bill will be 311000 or 0.008. This conversion insures an accurate cost of material and order quantity. l Everything used to produce a product or perform a service must be included in the BOM regardless of quantity used because noninclusion could result in an item becoming declared obsolete. This will cause the item not to be reordered resulting in no shipments of products containing that item. Table 6.] shows an example of the BOM for a scooter design capstone project. Table 6.2 lists all pans for an assembly item in Table 6.1

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Hospitality Employee Management And Supervision Concepts And Practical Applications

Authors: Kerry L Sommerville

1st Edition

0471745227, 9780471745228

More Books

Students also viewed these General Management questions

Question

How can an employee be constructively discharged?

Answered: 1 week ago

Question

MC 10 8 (dollars) 6 I MR Quantity 10 (dollars) QuantlW

Answered: 1 week ago