Answered step by step
Verified Expert Solution
Question
1 Approved Answer
(40 Marks) Question 2 University of Wakwesu is building a new set of hostels for students. The following table is provided information regarding the building
(40 Marks) Question 2 University of Wakwesu is building a new set of hostels for students. The following table is provided information regarding the building with activities and durations provided Activity Preceded by Excavation Foundation Steel Frame Brick Work Game Basement Plumbing Game Basement Floor Intial Plumbing Intial Wiring Airconditioning Plaster Ting Kitchen Fixtures Fins Plumbing Final Wood work Complete Roofing Butters and drain pipes Water Drains Vanishing Painting Complete electrical work Grading Walk Paths and Landscaping Excavation Foundation Steel Frame Foundation Game Basement Plumbing Game Basement Plumbing Steel Frame Steel Frame Intal Plumbing in tal Wiring Plaster Ting Ting Ting Brick Work Complete Rooling Foundation Final Wood work, Paintog Final Plumbing Kitchen Fatures Parting Gutters and drain pipes Water Drains Grading With aid of a network diagram, compute the following a Fany Start, Eady Fish b Late start, Late Finish c. Indicate the critical path d Calculate the project slack Duration (Weeks) 4 2 4 6 1 2 3 4 10 3 1
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access with AI-Powered Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started