Question

1 Approved Answer

4.1 Calculate the Minimum Cost Capacity-Feasible (MCCF) and the Cycle Time of the production line that assembles PM-B. Calculate the cost capacity and cycle time

image text in transcribed
4.1 Calculate the Minimum Cost Capacity-Feasible (MCCF) and the Cycle Time of the production line that assembles PM-B. Calculate the cost capacity and cycle time for each workstation first. Show the calculations of Workstation 1 and 4. Fill out the following table (Table 8).
image text in transcribed
4.2 The target cycle time for the assembly line is CT=20 days. The different options to achieve the target is give in Table 9. Find the cheapest options to achieve the targeted cycle time by filling out the Table 9 and Table 10. Calculate the cost and the cycle time of the best option.
image text in transcribed
image text in transcribed
To assemble PM-B in the factory in Stuttgart, it requires four steps performed in four workstations as depicted below. The assembly line has throughput target of three jobs per day and 1 machine can handle 1 job. c = 1.00 2 4 Table 7 The property values corresponding to the workstations Workstation Setup cost Unit cost (000 Eur) (000 Eur) (days) 20 2.5 1.25 1.75 3 10 18 Table 8 MCCP and cost of assembly line PM-B Workst Number Number of Utiliza Costs ation of Jobs Machines tion 000 ) (in ca? Cd? CT Total Cost CT Ratio of cost increase decrease increase/day (000 Eur) (days) 20 3.50 Table 9 Different options to reduce the cycle time Workstation Current Change number of machines Upgrade all machines to automatic ones Add two additional machines Reduce the variability four additional machines 1.17 Add 5.5 Table 10 The states after performing the changes Workstation Number of Utilization machines after change Cost of workstation (000 Eur) To assemble PM-B in the factory in Stuttgart, it requires four steps performed in four workstations as depicted below. The assembly line has throughput target of three jobs per day and 1 machine can handle 1 job. c = 1.00 2 4 Table 7 The property values corresponding to the workstations Workstation Setup cost Unit cost (000 Eur) (000 Eur) (days) 20 2.5 1.25 1.75 3 10 18 Table 8 MCCP and cost of assembly line PM-B Workst Number Number of Utiliza Costs ation of Jobs Machines tion 000 ) (in ca? Cd? CT Total Cost CT Ratio of cost increase decrease increase/day (000 Eur) (days) 20 3.50 Table 9 Different options to reduce the cycle time Workstation Current Change number of machines Upgrade all machines to automatic ones Add two additional machines Reduce the variability four additional machines 1.17 Add 5.5 Table 10 The states after performing the changes Workstation Number of Utilization machines after change Cost of workstation (000 Eur)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Multinational Finance

Authors: Kirt C. Butler

4th Edition

1405181184, 978-1405181181

More Books

Students also viewed these Finance questions