Question
5. You manufacture two types of white paint: Gloss and Flat. You are allocating MOH using ABC costing, and you use three cost pools: (1)
5. You manufacture two types of white paint: Gloss and Flat. You are allocating MOH using ABC costing, and you use three cost pools: (1) Material Handling, (2) Machine Setup, and (3) Inspection Total MOH is $100,000 and consists of: Material Handling: $50,000 which is allocated using Direct Labor hours, Machine Setup $30,000 which is allocated using Machine Hours, and Inspection $20,000 which is allocated using number of inspections. The company makes two products: White gloss paint and flat white paint. The following data is available for the production period:
Direct Labor Hours: Gloss Paint = 10 hours; Flat Paint = 5 hours
Machine Hours: Gloss Paint = 8 hours; Flat Paint = 2 hours
Number of Inspections: Gloss Paint = 1 inspection; Flat Paint = 3 inspections
a. Allocate the Material Handling MOH among the two products.
b. Allocate the Machine Setup MOH among the two products.
c. Allocate the Inspection MOH among the two products.
d. How much total MOH was allocated to each product?
e. How much was total MOH per your calculation? Did it equal the total prescribed in the instructions?
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started