Answered step by step
Verified Expert Solution
Question
1 Approved Answer
5.1 A time study of a finishing operation yielded the following observed times for one element (element A) of a job with a performance rating
5.1 A time study of a finishing operation yielded the following observed times for one element (element A) of a job with a performance rating of 1.20. The allowance is 15% of the job time. Element A Observed Times: Observation(i) 1 2 3 4 5 6 7 8 9 10 Total Time (x),minutes 5 9 10 21 11 5 9 10 21 11 112 5.1.1 Calculate the observed time for element A. (2) 5.1.2 Calculate the normal time for element A. (2) 5.1.3 Calculate the allowance time for element A. (2) 5.1.4 Calculate the standard time for element A. (2) 5.2 In developing standards for one operation, a time-study analyst observed an operator for 40 minutes during which the operator completed 52 parts. The analyst rated the worker at 120%. The base wage for the operator is R26 per hour and the firm's policy is to assign a 15% total operator allowance for fatigue and contingencies. Given the above information, calculate the following: 5.2.1 The Normal Time for the task. (3) 5.2.2 The Standard Time for the task. (3)
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started