Answered step by step
Verified Expert Solution
Question
1 Approved Answer
5-19 ABC, cost hierarchy, service. (CMA, adapted) CoreTech Laboratories does heat testing NHTY and stress testing (ST) on materials and operates at capacity. Under its
5-19 ABC, cost hierarchy, service. (CMA, adapted) CoreTech Laboratories does heat testing NHTY and stress testing (ST) on materials and operates at capacity. Under its current simple costing system, CoreTech aggregates all operating costs of $1,800,000 into a single overhead cost pool. CoreTech calculates a vate per test-hour of $20 ($1,800,000 90,000 total test@hours). HT uses 50,000 test-hours and ST uses 40,000 test- hours. Gary Celeste, CoreTech's controller, believes that there is enough variation in test procedures and cost structures to establish separate costing and billing rates for HT and ST. The market for test services is becoming competitive. Without this information, any miscosting and mispricing of its services could cause Core Tech to lose business. Celeste divides CoreTech's costs into four activity-cost categories, a. Direct-labor costs, $276,000. These costs can be directly traced to HT, $204,000, and ST $72,000. b. Equipment-related costs (rent, maintenance, energy, and so on). $495,000. These costs are allocated to HT and ST on the basis of test-hours c. Setup costs, $630,000. These costs are allocated to HT and ST on the basis of the number of setup- hours required. HT requires 15,000 setup-hours, and ST requires 6,000 setup-hours. d. Costs of designing tests, $399,000. These costs are allocated to HT and ST on the basis of the time re- quired for designing the tests. HT requires 4,000 hours, and ST requires 2,000 hours. 1. Classify each activity cost as output unit-level, batch-level, product- or service-sustaining, or facility- sustaining. Explain each answer. 2. Calculate the cost per test-hour for HT and ST. Explain briefly the reasons why these numbers differ from the $20 per test-hour that CoreTech calculated using its simple costing system. 3. Explain the accuracy of the product costs calculated using the simple costing system and the ABC system. How might CoreTech's management use the cost hierarchy and ABC information to better manage its business
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started