56 (1 point) In installation, the new system runs alongside the old one until it has been tested and is fully operational. 11 phased 21
56 (1 point) In installation, the new system runs alongside the old one until it has been tested and is fully operational. 11 phased 21 pilot plinge big-bang parallel