: PM komol vai Semo: An order for of a product is processed on operation A and operation B The setup time on A is minutes, and the run time per piece is minutes. The setup time on B is minutes, and the run time is minutes per piece. It takes minutes to move a lot between A and B Since this is a rush order, it is given top priority and is run as soon as it arrives at either workstation. The total manufacturing lead time for processing these pieces is: