Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

6 ) A communication link uses circuit switching technology to transmit a message of 5 x 1 0 4 bytes. Assume the length of the

6) A communication link uses circuit switching technology to transmit
a message of 5x104 bytes. Assume the length of the line is 100 km,
the velocity of propagation is 108 m/s and the data rate is 100 Mbps.
The maximum efficiency in this case is:
(a)580%(b)100%
6
((a)
(c)50%
(b)
(c)
(d) neither a, b or c
(d)
7) Two nodes in a local area network forward frames of 1000-bits.
The propagation time between the two nodes is 2 times the
transmission time.
If the two stations use stop-and-wait, what will be the maximum line
efficiency?
(a)50%
(b)1000
7.1
(a)
(b)
(c)100%
(C)
(d)1%
(d)
In this case if the two stations use sliding window protocol, the
maximum line efficiency will be up to:
(a)100%(b)10%
(c)90%
(d)1
7.2(a)
(b)
(c)
(d)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Databases questions