Answered step by step
Verified Expert Solution
Question
1 Approved Answer
7. Jafney Chara Nurazimi Berhad is a company producing Bedsheet. The followings are information on cost per unit of bedsheet with an assumption that the
7. Jafney Chara Nurazimi Berhad is a company producing Bedsheet. The followings are information on cost per unit of bedsheet with an assumption that the normal production volume is 3,400 units: Direct material (2.5 meters @RM1.80 per meter) RM 4.50 Direct labour (30 minutes @RM0.60 per minute) RM18.00 Overhead: Variable (30 minutes @RM0.45 per minute) RM13.50 Fixed (30 minutes @RM0.30 per minute) RM 9.00 RM22.50 Total standard costs per unit RM45.00 Factory overhead is charged to the product based on direct labour hour. Each unit of bedsheet needs 30 minutes of direct labour time. In January, 4,110 units of bedsheet were produced. The actual data cost of the products are as follows: Direct material quantity Direct labour Overhead 1.65 meter @ RM1.20 per meter RM32,880 for 82,200 minutes RM85,000 Required: a) Calculate the direct material price variance b) Calculate the direct material quantity variance Calculate the direct labour rate variance Calculate the direct labour efficiency variance Calculate the Factory overhead cost variance. (40 Marks) END OF THE PAPER
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started