Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

7.23 Plant-wide versus production cost pools L02, 3 Flexible Manufacturers produces small batches of customised products. The accounting system is set up to allocate plant

image text in transcribed
7.23 Plant-wide versus production cost pools L02, 3 Flexible Manufacturers produces small batches of customised products. The accounting system is set up to allocate plant overhead to each job using the following production cost pools and overhead allocation rates. Lebourpeeed assembly $25 per direct labour hour Machinepaced assembly $18 per machine hour Quality testing $ 2 per unit Actual resources used for job "l5: Direct labour hours 3 Machine hours 1.25 Number of units 36 The manufacturing accountant wants to simplify the cost accounting system and use a plantwide rate. If the preceding costs were grouped into a single cost pool and allocated based on labour hours. the rate would be $35 per direct labour hour. Required (a) What cost should be allocated to job 75 using the plantwide overhead rate'?I (b) What cost should be allocated to job 75 using the production cost pool overhead rates? (c) Why do the allocated amounts in parts (a) and (b) differ'Il ((1) Which method would you recommend? Explain your choice. 5 an III-Inow. n' val-\"av\".- nan-Inmnni nul- nu-n-I-lnnal uni-Inn I HR 6

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Managerial Accounting

Authors: James Jiambalvo

7th Edition

1119577721, 978-1119577720

More Books

Students also viewed these Accounting questions