Answered step by step
Verified Expert Solution
Question
1 Approved Answer
8. (Chapter 6): Estimate the production rate in bf hr of entire process of loading, unloading and hauling lumber in construction site. The lumber will
8. (Chapter 6): Estimate the production rate in bf hr of entire process of loading, unloading and hauling lumber in construction site. The lumber will be hauled 5 miles at an average haul speed of 30 miles per hour. The average return speed will be 45 miles per hour. A crew of three laborers and one truck driver will be able to unload and stack the lumber at 1,000 bf per hour per worker. A loader will load the trucks at the stockpile in 15 minutes. The capacity of truck is 2,500 board feet. (10 Points) 8. (Chapter 6): Estimate the production rate in bf hr of entire process of loading, unloading and hauling lumber in construction site. The lumber will be hauled 5 miles at an average haul speed of 30 miles per hour. The average return speed will be 45 miles per hour. A crew of three laborers and one truck driver will be able to unload and stack the lumber at 1,000 bf per hour per worker. A loader will load the trucks at the stockpile in 15 minutes. The capacity of truck is 2,500 board feet. (10 Points)
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started