Answered step by step
Verified Expert Solution
Question
1 Approved Answer
A 3 in diameter, 1 2 in long cylindrical workpiece is to be turned down to 2 . 8 in in two identical passes on
A in diameter, in long cylindrical workpiece is to be turned down to in in
two identical passes on a CNC turning machine using feed f inrev The cut will be
made with a tool whose Taylor tool life parameters are n and C ftmin The
machine is semiautomatic; so an operator loads and unloads the machine; the total handling time
loading and unloading of a part is min. and the tool change time is min. The machine takes
min in total to position the tool for the two passes together. The cost of the operator and
machine $hr the machine uses cuttingedge cemented carbide inserters; the cost of one
insert is $ Determine a the time to complete one production cycle at minimum cost, b cost
of the production cycle. c If the setup time for this job is hours and the batch size
parts, how much will it cost to complete one batch?
Step by Step Solution
There are 3 Steps involved in it
Step: 1
To determine the time to complete one production cycle at minimum cost as well as the cost of the pr...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started