A 3 in diameter, 1 2 in long cylindrical workpiece is to be turned down to 2 . 8 in in two identical passes on

A 3 in diameter, 12 in long cylindrical workpiece is to be turned down to 2.8 in in
two identical passes on a CNC turning machine using feed f =0.005 in/rev. The cut will be
made with a tool whose Taylor tool life parameters are n =0.25 and C =1100 ft/min. The
machine is semiautomatic; so an operator loads and unloads the machine; the total handling time
(loading and unloading) of a part is 3 min. and the tool change time is 2 min. The machine takes
0.8 min in total to position the tool for the two passes together. The cost of the operator and
machine = $42/hr, the machine uses 3-cutting-edge cemented carbide inserters; the cost of one
insert is 9 $. Determine (a) the time to complete one production cycle at minimum cost, (b) cost
of the production cycle. (c) If the setup time for this job is 4.0 hours and the batch size =320
parts, how much will it cost to complete one batch?

Step by Step Solution

There are 3 Steps involved in it

Step: 1

To determine the time to complete one production cycle at minimum cost as well as the cost of the pr... blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Automation Production Systems and Computer Integrated Manufacturing

Authors: Mikell P.Groover

3rd edition

132393212, 978-0132393218

More Books

Students also viewed these Mechanical Engineering questions

Question

What is material requirements planning (MRP)?

Answered: 1 week ago

Question

What are the six phases of the general design process?

Answered: 1 week ago

Question

What is ISO 9000?

Answered: 1 week ago