a. A gantry is to be built on the side of a steep hill, see picture. b. After installing foundations for the identical towers A

a. A gantry is to be built on the side of a steep hill, see picture.

image text in transcribed

b. After installing foundations for the identical towers A and B, a plinth has to be erected for tower B to compensate for the hill slope. On completion of the plinth a sighting is taken from its top to determine the height of base to be constructed for tower A to ensure final levelling. The foot of each tower is clamped in position by a series of securing plates fitted to base A and the plinth.

c. The activities to be considered with their estimated duration and manpower requirements are, see table:

image text in transcribed

d. Produce an activity on arrow network for the project identifying the critical path and determine the minimum duration of the project in days. Show total float and free float on your network.

e. Produce a tabulated, job oriented, analysis of the network.

f. Produce a bar chart representation of the network and a resource diagram for the project.

g. What will be the effect if the digging of foundation A (activity B) was extended to

i. 6 Days

ii. 8 days

h. If the maximum number of men available on any day was six, could the project be completed in the minimum time determined in part d assuming the digging of foundation A took the two days scheduled.

SPAN TOWER A TOWER B BASE A FOUNDATION A PLINTH HILLSIDE FOUNDATION B Serial Activity Duration (days) Men 3 Mark out site Dig foundation A Concrete foundation A Build base A Fit securing plates for A Erect tower A Dig foundation B Concrete foundation B Erect Plinth NA WNNNA W Fit securing plates for B Erect tower B Nm7 Erect span SPAN TOWER A TOWER B BASE A FOUNDATION A PLINTH HILLSIDE FOUNDATION B Serial Activity Duration (days) Men 3 Mark out site Dig foundation A Concrete foundation A Build base A Fit securing plates for A Erect tower A Dig foundation B Concrete foundation B Erect Plinth NA WNNNA W Fit securing plates for B Erect tower B Nm7 Erect span

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Modern Database Management

Authors: Jeffrey A. Hoffer Fred R. McFadden

9th Edition

B01JXPZ7AK, 9780805360479

More Books

Students also viewed these Databases questions

Question

Describe how projective tests are used.

Answered: 1 week ago

Question

3. How has e-commerce transformed marketing?

Answered: 1 week ago