Answered step by step
Verified Expert Solution
Question
1 Approved Answer
A B C D E F G H Stanford Enterprises uses job-order costing. 2 The allocation base for overhead is direct labor hours. 3 4
A B C D E F G H Stanford Enterprises uses job-order costing. 2 The allocation base for overhead is direct labor hours. 3 4 Data for the year just ended: 5 Estimated total manufacturing overhead cost $ 275,000 6 Estimated total direct labor hours 25,000 7 Actual total direct labor hours 27,760 9 Actual costs for the year: 10 Purchase of raw materials (all direct) $375,000 11 Direct labor cost $536,300 12 Manufacturing overhead costs $302,750 13 14 Inventories: Beginning Ending 15 Raw materials (all direct) $ 15,000 11,375 16 Work in process $ 27,875 EA 22,350 17 Finished goods $ 34,600 EA 26,450 18 19 Use the data to answer the following. 20 21 1. Compute applied overhead and determine the amount of underapplied or overapplied overhead: 22 Actual manufacturing overhead cost 23 Predetermined overhead rate 24 Actual direct labor hours24 Actual direct labor hours 25 Manufacturing overhead applied 27 Underapplied (overapplied) manufacturing overhead 29 2. Prepare a schedule of cost of goods manufactured: 30 31 Stanford Enterprises 32 Schedule of Cost of Goods Manufactured 33 Direct materials: Raw materials inventory, beginning 35 Add: Purchases of raw materials 36 Total raw materials available 37 Deduct: Raw materials inventory. ending 38 Raw materials used in production 39 Direct labor 40 Manufacturing overhead applied to work in process 41 Total manufacturing costs 42 Add: Beginning work in process inventory 44 Deduct: Ending work in process inventory 45 Cost of goods manufactured 47 3. Prepare a schedule of cost of goods sold. 48 49 Stanford Enterprises 50 Schedule of Cost of Goods Sold 51 52 Finished goods inventory, beginning 53 Add: Cost of goods manufactured 54 Cost of goods available for sale 55 Deduct: Finished goods inventory, ending 56 Unadjusted cost of goods sold 57 Underapplied (overapplied) overhead Adjusted cost of goods sold 59 60Stanford Enterprises has provided its manufacturing estimated and actual data for the year end. The Controller has asked you to compute the predetermined overhead rate, the schedule of cost of goods manufactured, and the schedule of cost of goods sold. Use the information included in the Excel Simulation and the Excel functions described below to complete the task. 0 Cell Reference: Allows you to refer to data from another cell in the worksheet. From the Excel Simulation below, if in a blank cell, \"=E5" was entered, the formula would output the result from cell E5, or $275,000 in this example. 0 Basic Math functions: Allows you to use the basic math symbols to perform mathematical functions. You can use the following keys: + (plus sign to add), (minus sign to subtract), ' (asterisk sign to multiply), and I (forward slash to divide). From the Excel Simulation below, if in a blank cell \"=E6+E7" was entered, the formula would add the values from those cells and output the result, or 52,760 in this example. if using the other math symbols the result would output an appropriate answer for its function. 0 SUM function: Allows you to refer to multiple cells and adds all the values. You can add individual cell references or ranges to utilize this function. From the Excel Simulation below, if in a blank cell \"=SUM(E10,E11,E12)" was entered, the formula would output the result of adding those three separate cells, or 1,214,050 in this example. Similarly, if in a blank cell \"=SUM(E10:E12)" was entered, the formula would output the same result of adding those Cells, except they are expressed as a range in the formula, and the result would be 1,214,050 in this example
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started