Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

A batch of 900 parts has been produced and a decision is needed whether or not to 100% inspect the batch. Past history with this

A batch of 900 parts has been produced and a decision is needed whether or not to 100% inspect the batch. Past history with this part suggests that the fraction defect rate is around 0.03. Inspection cost per part is $0.20. If the batch is passed on for subsequent processing, the damage cost for each defective unit in the batch is $10.00.

Given the data from above, sampling inspection is being considered as an alternative to 100% inspection. The sampling plan calls for a sample of 30 parts to be drawn at random from the batch. Based on the operating characteristic curve for this sampling plan, the probability of accepting the batch is 96% at the given defect rate of q = 0.03. Determine the batch cost for sampling inspection.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Advanced Engineering Mathematics

Authors: Dennis G Zill, Warren S Wright

5th Edition

1449679781, 9781449679781

More Books

Students also viewed these Mathematics questions

Question

What are some constraints in user interface design?

Answered: 1 week ago

Question

Please help me evaluate this integral. 8 2 2 v - v

Answered: 1 week ago