A building contractor is to dig a foundation 42 feet long, 15 feet wide, and 3 feet deep. The contractor pays $5 per load
A building contractor is to dig a foundation 42 feet long, 15 feet wide, and 3 feet deep. The contractor pays $5 per load for trucks to remove the dirt. Each truck holds 7 cubic yards. What is the cost to the contractor to have all the dirt hauled away? The cost to the contractor is $ 50