Question
A company manufactures plastic bottles for the beverage industry. The cost standards per 100 bottles are listed below. Cost Category Standard Cost Per 100 Bottles
A company manufactures plastic bottles for the beverage industry. The cost standards per 100 bottles are listed below.
Cost Category Standard Cost
Per 100 Bottles
Direct labor $2.00
Direct materials 9.10
Factory overhead 0.55
Total $11.65
At the beginning of the month the company planned to produced 400,000 bottles. The actual number of produced for the month was 406,000. Actual costs for July of the current year were as followed.
Cost Category Standard Cost
Per 100 Bottles
Direct labor $2.00
Direct materials 9.10
Factory overhead 0.55
Total $11.65
- How would I prepare standard cost budget (direct labor, direct materials, and factory overhead) assuming planned production.
- How would I make budget performance repot for manufacturing costs, showing total cost variances for direct materials, direct labor, and overhead
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started