Question
1 Approved Answer
A company produces two products, Product A , which sells for $ 2 1 0 per unit, and Product B , which sells for $
A company produces two products, Product A which sells for $ per unit, and Product B which sells for $ per unit, using three activities: Design, which uses engineering hours as the cost driver; Machining, which uses machine hours as the cost driver; and Inspection, which uses the number of batches as the cost driver. The cost of each activity and usage of the cost drivers are as follows:
tableUsage byUsage byActivity Pool DriverCost of Pool,Product AProduct BDesign engineering hours$Machining machine hoursInspection batches
The company manufactures units of Product A and units of Product B per month. Each unit of Product A uses $ of direct materials and $ of direct labor, while each unit of Product B uses $ of direct materials and $ of direct labor.
Required:
a Calculate the Design activity proportions for Products A and B
b Calculate the Machining activity proportions for Products A and B
c Calculate the Inspection activity proportions for Products A and B
d Determine the indirect costs assigned to Product A
e Determine the indirect costs assigned to Product B
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3