A concrete structure consists of 14 columns to support an elevated floor slab. The columns are 18 inches square and 10 feet high. Assume there
- A concrete structure consists of 14 columns to support an elevated floor slab. The columns are 18 inches square and 10 feet high. Assume there will be no reuse of column forms. Estimate the total cost and cost per SFCA for building, erecting and removing the formwork for these columns. Refer tables to find out quantities of materials and labor hours required for these columns. Use average values in the table for estimating purpose.
Plywood of 4 x 8 ft will be used. The application rate of form oil is 400 SFCA per gallon. All the columns will be erected simultaneously. The clamps will be rented.
The following cost information applies: (15 points)
Plywood sheet (4 x 8 ft): $35.00 per sheet
Lumber: $0.70 per bf
Clamp: $4.00 per clamp for renting
Form Oil: $8.50 per gallon
Carpenters: $25.00 per hour
Laborer: $17.00 per hour
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started