A construction worker needs to pour a rectangular slab 20 ft long, 28 ft wide, and 9 in. thick. How many cubic yards of
A construction worker needs to pour a rectangular slab 20 ft long, 28 ft wide, and 9 in. thick. How many cubic yards of concrete does the worker need? (Assume tha the construction worker cannot buy a fraction of a cubic yard of concrete.) The worker needs cubic yards of concrete. (Type a whole number, rounded up to the nearest full cubic yard of concrete.) *****